NovaCloud-Hosting - IP-Transit FFM1 - System replacement and upgrades – Maintenance details
All systems operational
IP-Transit FFM1 - System replacement and upgrades
Completed
Scheduled for 20 July, 2025 at 4:00 AM – 23 July, 2025 at 9:59 PM
Affects
FFM1 IP-Transit
Under maintenance from 4:00 AM to 9:59 PM
Updates
Completed
23 July, 2025 at 9:59 PM
Completed
23 July, 2025 at 9:59 PM
Maintenance has completed successfully.
Since July 23, 2025, the setup has been successfully operating in active-active mode on both routers.
Update
20 July, 2025 at 7:09 AM
In progress
20 July, 2025 at 7:09 AM
even if everything is currently running, the measures are not yet fully completed. we will leave this window open until all work is completed so that parallel operation of the routers works without any problems. at the moment, however, gretap, vxlan, wireguarda and gre should work until we continue later.
Update
20 July, 2025 at 4:23 AM
In progress
20 July, 2025 at 4:23 AM
ok seems like that we have some issue going on after some runtime, looking into it...
Update
20 July, 2025 at 4:04 AM
In progress
20 July, 2025 at 4:04 AM
since about 06:04 the load is already fully active on the new routers, please open a ticket if you encounter problems, currently everything seems to have worked as planned.
In progress
20 July, 2025 at 4:00 AM
In progress
20 July, 2025 at 4:00 AM
Maintenance is now in progress
Planned
20 July, 2025 at 4:00 AM
Planned
20 July, 2025 at 4:00 AM
We are planning for a scheduled maintenance during that time.
This is our response to repeated minor interruptions since the migration from FRA1 to FFM1. Specifically, we will:
- Increase the total processing bandwidth from 20 Gbps to 80 Gbps, i.e. quadruple it.
- Replace the currently heavily loaded system with 2 new future-proof systems
- Switchover to a BGP multipath setup for consistent redundancy and maximum reliability
For affected customers, this means that there may be several outages during the maintenance-window until the work has been completed.